Total views : 246

Technical and Economic Feasibility study on Repowering of Wind Farms

Affiliations

  • Department of Electrical and Electronics Engineering, Amrita School of Engineering, Coimbatore, Amrita Vishwa Vidyapeetham, Amrita University, 641112, India

Abstract


Objectives: The main objective of the paper is to perform a repowering assessment of an old wind farm consisting of 2 bladed turbines located at Gudimangalam near Coimbatore in Tamil Nadu which is a good wind potential site. Methods/Statistical Analysis: Repowering refers to the replacement of first generation small capacity wind turbines with modern multi megawatt wind turbines that can produce more energy than before from the same site. Technical analysis of the site is done using WAsP software with the help of wind data collected from a met mast at the site and includes the calculation of Net Annual Energy Production and Wake losses. Net Annual Energy Production and Wake losses are the primary indicators for selecting the best options for repowering. The option selected is further supported by calculating the economic performance indices. The total repowering has been accomplished through partial repowering executed in three stages. Partial repowering refers to the replacement of only few of the turbines from the existing wind farm rather than replacing the whole farm. The economic feasibility of every repowering option has been studied based on the calculation of the economic performance indices like ALCoG, Payback Period and IRR. Findings: The study mainly results in framing a procedure for performing total repowering for any site through the optimization of best possible partial repowering options. The existing site comprises 18 turbines of 450 kW rating and is having a net AEP of 14.5 GWh with a wake loss of 3.82%. The Plant Load Factor (PLF) is obtained to be 20.44%. The best possible total repowering option is found to be producing a net AEP of 65.287 GWh with a wake loss of 2.36% and included 9 Suzlon S95 2.1 MW turbines which are four times the AEP of the existing farm. The three stages of partial repowering also include replacement of 6 old turbines by 3 new turbines in each stage. Finally the total repowering is reached through the execution of partial repowering options in three stages and it results in close proximity to the best possible total repowering option in both technical and economic aspects. The final repowering eventually attained results in a net AEP of 65.28 GWh with a wake loss of 2.36% which is the exact match of the best possible total repowering option found in the beginning. The total repowering also leads to an improvement in PLF i.e. almost doubles the PLF to 39.42%. Application/Improvements: This procedure can be very useful where the initial investment is an important factor. The study infers that performing total repowering through optimization process is more beneficial than performing partial repowering randomly.

Keywords

ALCoG, IRR, Payback Period, Partial Repowering, Repowering, WAsP.

Full Text:

 |  (PDF views: 215)

References


  • Bhutta MMA, Hayat N, Farooq AU, Zainn Ali, Rehan Jamil, Zahid Hussain. Vertical axis wind turbine – A review of various configurations and design techniques. Renewable and Sustainable Energy Reviews, 2012 May; 16 (4): 1926–39.
  • Date Accessed: 10/07/2016. Wind_power_in_India. Available from: https://www.wikipedia.org/wiki/Wind_power_in_India
  • Shakoor R, Hassan MY, Raheem A, Rasheed N. The modelling of wind farm layout optimization for the reduction of wake losses. Indian Journal of Science and Technology. 2015 Aug; 8(17): 1–9.
  • Prabu T, Kottayil SK. Repowring A Windfarm – A Techno Economic Approach.Wind Engineering. 2015 Aug; 39(4): 385–97.
  • Gonzalez JS, Payan MB, Santos JMR, Longatt FG. A review and recent developments in the optimal wind turbine micro siting problem. Renewable and Sustainable Energy Reviews. 2014 Feb; 30: 133–44.
  • Date Accessed:2/01/2014 .The 10 biggest turbines in the world. Available from: http://www.power-technology.com/features/featurethe-worlds-biggest-wind-turbines-4154395/
  • Sarja J, Halonen V. Case study of wind turbine sourcing: Manufacturer selection criteria; London, Canada; IEEE Power and Energy Conference;2012 Oct. p. 210–5.
  • Date Accessed: 8/03/2016. Government mulls policy to promote wind energy projects. Available from: http://www. articles.economictimes.indiatimes.com/2016-03-08/news/71309227_1_wind-energy-wind-power-projects-wind-mills
  • Date Accessed: 23/09/2015. Re-wind – repower the old wind power projects. Available from: http://www.idaminfra.com/wp-content/uploads/2015/12/AjitPandit_Presentation-on-Repowering-at-RExpo_23Sep2015_forwebcirculation.pdf
  • Verma M, Ahmed S, Bhagoria JL. A review: repowering of Indian wind farms. International Journal on Emerging Technologies. 2015 Feb; 6(1): 2–18.
  • Lantz E, Leventhal M, Gould IB. Wind power project repowering–financial feasibility, decision drivers and supply chain effects. In Series: NREL/TP-6A20-60535. Technical Report. 2013 Dec. p. 1–31.
  • Nivedh BS, Devi RPK, Sreevalsan E. Repowering of wind farms – a case study.Wind Engineering. 2013 Mar; 37 (2): 137–50.
  • Date Accessed: 4/10/2016. WAsP tool for wind energy assessment. Available from: http://www.wasp.dk
  • Date Accessed: 2/07/2016. Global mapper.Available from: https://www.wikipedia.org/wiki/Global_Mapper
  • Date Accessed: 12/06/2014. SUZLON S88 2.1MW. Available from: http://www.suzlon.com/pdf/Suzlon-S88-2.1MW-product-brochure.pdf
  • Date Accessed: 7/3/2016. Tamil Nadu Electrcity Regulatory Commission (TNERC). Available from: http://tnerc.tn.nic.in/Order.htm#212
  • Date Accessed: 8/01/2014. State wise wind power tariff in India. Available from: https://urvishdave.wordpress.com/2014/01/08/wind-energy-sector-in-india-overview-state-wise-wind-feed-in-tariffs-fit-in-india-along-with-benefits-incentives-for-windmill-power-projects-in-india

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.