Uncertainty Assessment for Updating Platform Decommissioning Alternatives Cost using Net Present Value Approach

Affiliations

  • Department of Petroleum Engineering, Universiti Teknologi PETRONAS, Seri Iskandar, Perak,, Malaysia
  • Faculty of Petroleum Engineering and Geoscience, Universiti Teknologi PETRONAS, Seri Iskandar, Perak,, Malaysia
  • Department of Civil Engineering, Universiti Teknologi PETRONAS, Seri Iskandar, Perak,, Malaysia

Abstract


Background/Objectives: Offshore oil and gas platform are aging in Asian Pacific Region and requiring a transparent decommissioning framework to address the major environmental impacts and cost pertaining the removal of offshore structures. This paper endeavors to establish a benchmark model to update platform decommissioning cost for four decommissioning options. Methods/Statistical Analysis: This paper provides a benchmark methodology adopting a case study for a previous decommissioning project to estimate and updateplatform decommissioning cost based on Net Present Value (NPV) approach. Linear regression was established to predict cost inflation in decommissioning projects to be put to use in NPV method. Monte Carlo Simulations were employed to assess and evaluate uncertainty, and variability of each decommissioning alternative cost model to validate their exemplary implementation. Findings: After implementing Net Present Value methodology to attain platform decommissioning cost, it was found that platform decommissioning costs were USD91,997,398.97 USD29,312,019.08 USD36,913,049.82, and USD21,185,843.13 for complete removal, partial removal, conversion to reef, and re-using platform for wind turbine power generation respectively. These cost data reveal the tremendous cost incurred by platform’s owners due to decommissioning. Uncertainty and variability of cost update estimation were demonstrated through Monte Carlo Simulations. After running 100,000 simulations, the results showed insignificant discrepancy with uncertainty ratio varies between 0.023% and 0.10% for the four decommissioning alternatives. Therefore, Monte Carlo Simulation exhibits a very good agreement with the cost estimate using NPV which just confirms the viability and applicability of utilizing NPV method in updating decommissioning cost for offshore installations. Hence, the contribution of this study is significant and timely efficient, allowing for cost update through systematic method instead of embracing regression analysis which is tedious and time-consuming. Application/Improvements: Net Present Value methodology may be useful and newly tool in updating platform decommissioning cost, and can strengthen its applicability in this field by incorporating probabilistic method as such Monte Carlo Simulation.

Keywords

Net Present Value, Measuring Uncertainty, Monte Carlo Method, Platform Decommissioning Cost

Full Text:

 |  (PDF views: 253)

References


  • Parente V, Ferreira D, dos Santos EM and Luczynski E.Offshore decommissioning issues: Deductibility and transferability.Energy Policy Journal. 2006; 34:1992–2001.
  • Kaiser MJ and Liu M. Decommissioning cost estimation in the deepwater US Gulf of Mexico–Fixed platforms and compliant towers. Marine Structures Journal. 2014; 37:1–32.
  • Zawawi NWA, Liew MS and Na KL. Decommissioning of offshore platform: A sustainable framework. 2012 IEEE Colloquium on Humanities. Science and Engineering (CHUSER). 2012; p. 26–31.
  • Twomey BG. Study assesses Asia-Pacific offshore decommissioning costs. Oil and Gas Journal. 2010; 108:51–5.
  • Ekins P, Vanner R and Firebrace J. Decommissioning of offshore oil and gas facilities: A comparative assessment of different scenarios. Journal of Environmental Management.2006; 79:420–38.
  • Techer EJ, Chandler J. Offshore installations, decommissioning and artificial reefs: Do current legal frameworks best serve the marine environment? Marine Policy Journal.2015; 59:53–60.
  • Siems GL. Decommissioning Process Optimization Methodology. Houston, Texas, USA: Presented at the Offshore Technology Conference. 2016.
  • Al-Ghuribi T, Liew M, Zawawi N, Ayoub M. Decommissioning decision criteria for offshore installations and well abandonment. in Engineering Challenges for Sustainable Future: Proceedings of the 3rd International Conference on Civil, Offshore and Environmental Engineering(ICCOEE 2016, Malaysia, 15–17 Aug 2016). 2016. p. 81.
  • Ferreira D, Suslick S, Farley J, Costanza R and Krivov S. A decision model for financial assurance instruments in the upstream petroleum sector. Energy Policy Journal. 2004; 32:1173–84.
  • Artificial Reef. Accessed Date: 24/11/2016: Available from: http://www.ccop.or.th/eppm/projects/40/docs/6%20 Artifical%20reefs%2014June12%20BT%20issued.pdf.
  • Friederichs C, Dibello F, Tignanelli F and Garzia A. Reliable and Innovative Approach for Decommissioning Study of Oil and Gas Plants. Offshore Mediterranean Conference and Exhibition. 2015.
  • Environmental Considerations in Offshore Decommissioning and Removal. Accessed Date: 22/11/2016: Available from: https://www.bmtcordah.com/media/5279543/J%20Ferris%20 Indonesia%20Decom%20Conference%20Presentation_Final.pdf.
  • Proserv Offshore. Decommissioning cost update for removing Pacific OCS Region offshore oil and gas facilities.Houston (TX): Minerals Management Service report MMS M09 P C. 2010; 24.
  • Byrd RC and Velazquez ER. State of the art of removing large platforms located in deep water. Offshore Technology Conference. 2001.
  • Hahn M, Gilman P. Offshore Wind Market and Economic Analysis. U.S. 2014.

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.